Skip to main content

ES-Spectra was established since 1987.

ES-Spectra specialized in different fields in

infrastructure, water treatment and re-habitation projects.

dealing with public and private sectors in

different fields

ES-Spectra executing different and complex projects

with international clients and international standards.

ES-Spectra experiences in design, execution and

operation and maintenance for different types of

projects.

ES-Spectra executing different and complex projects

with international clients and international standards.

 Infrastructure water and sewer networks & Pump stations

Water and Waste water treatments plants

Re-habitation of existing stations

Water tanks

  Operation and maintenance of treatment plants

These are just a few examples of our successful partnerships with forward-thinking businesses, driven by innovation, excellence, and sustainable growth.

Our Story

ES-Spectra specialized in different fields in infrastructure, water and waste water treatment plants and re-habitation, sewer networks, water networks & pump stations

Sustainable Success Partner

ES-Spectra experiences in design, execution and operation and maintenance for different types of projects.

Expertise For Results

ES-Spectra dealing with public and private sectors in different fields.
ES-Spectra executing different and complex projects with international clients and international standards.

Board

One powerful statement, not a generic description

💡 Example:

Engineering smart inspection systems for underground infrastructure with precision vision technology.

Engineer Mohmed Fahmy

“Technology-led leadership shaping a smarter industrial future.”


Engineer Yousri Rayan

“Technology-driven engineering safety and reliability.” 

On Going Projects

Strategic Business Planning

Managing business

Projects accomplished

THESE ARE JUST A FEW EXAMPLES OF OUR SUCCESSFUL PARTNERSHIPS WITH FORWARD-THINKING BUSINESSES, DRIVEN BY INNOVATION, EXCELLENCE, AND SUSTAINABLE GROWTH.

01

PROJECT NAME : Construction of Shouka Village Wastewater Collection System project description. 

Client : Water &wastewater company in Sohag 

 

Description: Sanitary Sewer Networks. 

Project Components: 

Gravity Sewage Networks – Force main line –Pump Station  

Gravity Sewage Networks: 

UPVC Pipes 

Diameter range from 160 mm to 800 mm with total length of 21,210 m. Supplied and installed UPVC pipline DN 800 mm and length 684 m. 

Circular Manholes with depth range from (1.5 to 3.5m) &Numbers =730. 

Force main line: 

HDPE Pipes. 

Dim 200 mm &Length = 144 m. 

Pump Station: 

One pump station, Depth range: 9 m , Internal Diameter: 4 m  with total capacity 60 l/s 

Supplied and install all electromechanical equipment ( Pumps, Cranes, Screening Facilities, Ventilation, Valves and Fittings, Water hammer, Generator, Transformer, control and instrumentation equipment………etc.) 

Project duration: 27 months

02

PROJECT NAME : Qanteer –waste water treatment plant – Sharkia.     

Client : Water &wastewater company in Sharkya + European investment bank    . 

 

DATE : 2019 

 

Description:  

Design & construction of wastewater treatment plant with capacity of (10000m3/day) first stage and 15000 second stage complete works with all civil, electromechanically works and operate for one year:  

 

Mechanical &mechanical screen, grit removal, flowmeter chamber  

Two primary sedimentation tanks  

Two biological tanks  

Two final sedimentation tanks  

24 drying bed  

Two thickener 

Pumping station for primary sludge excess and return slug pump and supernatant pump  

Firefighting system  

Chlorination system 

Project duration: 24 months

03

Akhmim Water and Wastewater Treatment Plant .

 

Client : industrial and mining projects authorty   

  

DATE : 2014  

 

Description:  

water treatment plant  

Intake  

Rising main lines ( raw water, filtered water & sludge ) 

Total capacity 210 L/sec  

Project duration: 12 months

04

PROJECT NAME - KOM EL SHOKAFA


DATE: 2017

Description: Sanitary Sewer Networks.

Project includes the following:

Gravity Sewage Networks, force main line, one pump station, and tunnel crossing.

Gravity Sewage Networks:

UPVC Pipes

Depth range: 0 to 6.5 m

Diameter range from 225 mm to 630 mm, with a total length of 27,728 m.

Force main line:

HDPE Pipes

Diameter: 400 mm & Length: 1,400 m.

Pump Station:

One pump station, depth range: 10 m, internal diameter range: 5 m, with total capacity of 195 l/s.

Supply and install all electromechanical equipment (pumps, cranes, screening facilities, ventilation, valves and fittings, water hammer, generator, transformer, control, and instrumentation equipment, etc.).

Project duration: 29 months

Projects

Client: Water & Wastewater Company in Sohag

Description: Sanitary Sewer Networks.

Project Components:

- Gravity Sewage Networks
- Force Main Line
- Pump Station

Gravity Sewage Networks:

UPVC Pipes

Diameter ranges from 160 mm to 800 mm with a total length of 21,210 m. Supplied and installed UPVC pipeline DN 800 mm with a length of 684 m.

Circular Manholes with a depth range from 1.5 m to 3.5 m; Number = 730.

Force Main Line:

HDPE Pipes.

Dimension: 200 mm; Length = 144 m.

Pump Station:

One pump station, depth range: 9 m; internal diameter: 4 m with a total capacity of 60 l/s.

Supplied and installed all electromechanical equipment (pumps, cranes, screening facilities, ventilation, valves and fittings, water hammer, generator, transformer, control and instrumentation equipment, etc.).

Facing challenges of high energy costs and a substantial carbon footprint, our client sought to revolutionize its energy practices. Working hand-in-hand with Eco-Con's expert team, we implemented renewable energy solutions, incorporating solar and wind power into their operations. This resulted in a significant reduction in reliance on non-renewable sources, translating to both environmental benefits and substantial cost savings. Discover how this initiative became a beacon of sustainable excellence and an inspiration for businesses worldwide.

Project duration: 27 months

Akhmim Water and Wastewater Treatment Plant .

-Client: Sohag Water and Wastewater company (FWWC)
-Consultant: EL- DAR
-Capacity : 90 L/S
- CLIENT: SOHAG WATER AND WASTEWATER COMPANY (FWWC)
- CONSULTANT: EL-DAR
- CAPACITY: 90 L/S

Project duration: 12 months

Kom El Shoqafa, Alexandria

KOM EL SHUQAFA PROJECT CONSISTS OF SEVEN MAJOR ELEMENTS:

1. CONSTRUCTION OF DEEP WELLS AND VAULTS.

2. CONSTRUCTION OF FORCE MAIN, GRAVITY PIPELINE SYSTEMS AND ASSOCIATED VAULTS.

3. CONSTRUCTION OF PIEZOMETERS, ASSOCIATED VAULTS, AND ABANDONMENT OF EXISTING GROUNDWATER LOWERING SYSTEM.

4. CONSTRUCTION OF CONTROL BUILDING.

5. CONSTRUCTION OF OUTFALL AND IRRIGATION CONNECTION.

6. CONSTRUCTION OF TOMB SHADE STRUCTURES, CARACALLA, SHAFT COVER, AND VENTILATION FAN ROOM.

7. TRAINING, OPERATION, AND MAINTENANCE ACTIVITY.

Client: Water &wastewater company in elghrbia  

 

DATE: 2017  

 

Description: Sanitary Sewer Networks. 

Project includes the following; 

Gravity Sewage Networks, Force main line, one Pump Station and Tunnel Crossing. 

Gravity Sewage Networks: 

UPVC Pipes 

Depth range: 0 to 6.5 m  

Diameter range from 225 mm to 630 mm with total length of 27,728 m. 

 

Force main line: 

HDPE Pipes. 

Dim 400 mm &Length = 1,400 m. 

Pump Station: 

One pump station, Depth range:10 m, Internal Diameter range 5 m with total capacities 195 l/s 

Supply and install all electromechanical equipment (Pumps, Cranes, Screening Facilities, Ventilation, Valves and Fittings, Water hammer, Generator, Transformer, control and instrumentation equipment………etc 

Project duration: 29 months

05

PROJECT NAME :Beltag -pump station and network

Client : Water &wastewater company bltag

 

Description: Sanitary Sewer Networks. 

Project Components: 

Gravity Sewage Networks – Force main line –Pump Station  

Gravity Sewage Networks: 

UPVC Pipes 

Diameter range from 160 mm to 800 mm with total length of 21,210 m. Supplied and installed UPVC pipline DN 800 mm and length 684 m. 

Circular Manholes with depth range from (1.5 to 3.5m) &Numbers =730. 

Force main line: 

HDPE Pipes. 

Dim 200 mm &Length = 144 m. 

Pump Station: 

One pump station, Depth range: 9 m , Internal Diameter: 4 m  with total capacity 60 l/s 

Supplied and install all electromechanical equipment ( Pumps, Cranes, Screening Facilities, Ventilation, Valves and Fittings, Water hammer, Generator, Transformer, control and instrumentation equipment………etc.) 

Project duration: 27 months

06

PROJECT NAME :

Sharkia Sewer Networks for Abu Kabir district, Al-Dahtamoon village, Abu Kabir Sharkia Governorate

Client: Water & Wastewater Company in Sharkia + European Investment Bank.

Ø CLIENT: SHARKIA WATER AND WASTEWATER COMPANY
Ø CONSULTANT: TALAAT AND IMAM
Ø FUND: THE WORLD BANK (IBRD)
Ø PROJECT DESCRIPTION:
• GRAVITY SEWAGE NETWORKS: UPVC DIAMETER RANGE FROM 200 MM TO 600 MM WITH A TOTAL LENGTH OF 17,647 M.
• FORCE MAIN LINE: UPVC PIPES: DIM 250-400 MM & LENGTH = 4,865 M.

Project duration: 24 months

07

PROJECT NAME :

El shrouk water treatment plant 18000m3/day

 

CLIENT: FAYOUM WATER AND WASTEWATER COMPANY (FWWC)
CONSULTANT: STANTEC SA/NV & EGEC
PROJECT DESCRIPTION:
• GRAVITY SEWAGE NETWORKS: UPVC DIAMETER RANGE FROM 160 MM TO 700 MM WITH TOTAL LENGTH OF 42.11 KM.
• FORCE MAIN LINES: DIM (150-450) MM & LENGTH = 4.7 M.
• FOUR PUMP STATIONS.

Project duration: 12 months

08

PROJECT NAME : Gharbia Sewer Networks for Qotor 3 district, Beltag village, Gharbia Government. 

Client: Water & Wastewater Company in Elgharbia

DATE: 2017

Description: Sanitary Sewer Networks.

Project includes the following:

Gravity Sewage Networks, force main line, one pump station, and tunnel crossing.

Gravity Sewage Networks:

UPVC Pipes

Depth range: 0 to 6.5 m

Diameter range from 225 mm to 630 mm, with a total length of 27,728 m.

Force main line:

HDPE Pipes

Diameter: 400 mm & Length: 1,400 m.

Pump Station:

One pump station, depth range: 10 m, internal diameter range: 5 m, with total capacity of 195 l/s.

Supply and install all electromechanical equipment (pumps, cranes, screening facilities, ventilation, valves and fittings, water hammer, generator, transformer, control, and instrumentation equipment, etc.).

Project duration: 29 months

Projects

Client: Water & Wastewater Company 

Description: Sanitary Sewer Networks.

Project Components:

- Gravity Sewage Networks
- Force Main Line
- Pump Station

Gravity Sewage Networks:

UPVC Pipes

Diameter ranges from 160 mm to 800 mm with a total length of 21,210 m. Supplied and installed UPVC pipeline DN 800 mm with a length of 684 m.

Circular Manholes with a depth range from 1.5 m to 3.5 m; Number = 730.

Force Main Line:

HDPE Pipes.

Dimension: 200 mm; Length = 144 m.

Pump Station:

One pump station, depth range: 9 m; internal diameter: 4 m with a total capacity of 60 l/s.

Supplied and installed all electromechanical equipment (pumps, cranes, screening facilities, ventilation, valves and fittings, water hammer, generator, transformer, control and instrumentation equipment, etc.).

Project duration: 27 months

El shrouk water treatment plant 18000m3/day

El shrouk water treatment plant 18000m3/day

Project duration: 12 months

PROJECT NAME: Gharbia Sewer Networks for Qotor 3 District, Beltag Village, Gharbia Governorate.

Client: Water & Wastewater Company in Elgharbia

DATE: 2017

Description: Sanitary Sewer Networks.

Project includes the following:

Gravity Sewage Networks, Force Main Line, one Pump Station, and Tunnel Crossing.

Gravity Sewage Networks:

UPVC Pipes

Depth range: 0 to 6.5 m

Diameter range from 225 mm to 630 mm with a total length of 27,728 m.

Force Main Line:

HDPE Pipes.

Diameter: 400 mm & Length: 1,400 m.

Pump Station:

One pump station, Depth range: 10 m, Internal diameter range: 5 m with total capacity of 195 l/s.

Supply and install all electromechanical equipment (Pumps, Cranes, Screening Facilities, Ventilation, Valves and Fittings, Water Hammer, Generator, Transformer, control, and instrumentation equipment, etc.).

Client: Water &wastewater company in elghrbia  

 

DATE: 2017  

 

Description: Sanitary Sewer Networks. 

Project includes the following; 

Gravity Sewage Networks, Force main line, one Pump Station and Tunnel Crossing. 

Gravity Sewage Networks: 

UPVC Pipes 

Depth range: 0 to 6.5 m  

Diameter range from 225 mm to 630 mm with total length of 27,728 m. 

 

Force main line: 

HDPE Pipes. 

Dim 400 mm &Length = 1,400 m. 

Pump Station: 

One pump station, Depth range:10 m, Internal Diameter range 5 m with total capacities 195 l/s 

Supply and install all electromechanical equipment (Pumps, Cranes, Screening Facilities, Ventilation, Valves and Fittings, Water hammer, Generator, Transformer, control and instrumentation equipment………etc 

Project duration: 29 months

Projects under construction

 

Get In Touch

Ready to embark on your journey towards sustainable success? Contact us today to schedule a consultation.

16A , Hadaik El Obour Building - Salah Salem St - Cairo

Tel & Fax

+002-22612663 -+002- 22619981 - +002-22619482

+002 -012289146999